Construction Time-Lapse Video

Watch the new Dudley Municipal Center take shape as our team performs demolition, bracing, excavation, and construction out of the ground. Two camera angles show progress from the Shawmut site office (22 Warren Street) and from atop of the Boston Elder Services building (2315 Washington Street). This video shows progress to January 25, 2013.

This entry was posted in Construction. Bookmark the permalink.